Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs

Title
Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs
Author(s)
윤상흠이익선[이익선]
Keywords
COMMON DUE-DATE; EARLINESS-TARDINESS; MACHINE; PENALTIES; CHAIN
Issue Date
201012
Publisher
PERGAMON-ELSEVIER SCIENCE LTD
Citation
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.38, no.6, pp.509 - 521
Abstract
This paper considers a problem of integrated decision-making for job scheduling and delivery batching wherein different inventory holding costs between production and delivery stages are allowed. In the problem, jobs are processed on a facility at a production stage and then delivered at the subsequent delivery stage by a capacitated vehicle. The objective is to find the coordinated schedule of production and delivery that minimizes the total cost of the associated WIP inventory, finished product inventory and delivery, where both the inventory costs are characterized in terms of the weighted flow-time and the delivery cost is proportional to the required number of delivery batches. It is proved that the problem is NP-hard in the strong sense. Thereupon, three heuristic algorithms are derived. Some restricted cases are also characterized as being solvable in polynomial time. Numerical experiments are conducted to evaluate the performance of the derived heuristic algorithms. (C) 2010 Elsevier Ltd. All rights reserved.
URI
http://hdl.handle.net/YU.REPOSITORY/23236http://dx.doi.org/10.1016/j.omega.2010.01.001
ISSN
0305-0483
Appears in Collections:
경영대학 > 경영학과 > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE